Project Information Sheet

Part A: Basic Project Information

( Must be completed in all cases )
PIP No: 1604
1. PROJECT NAME: The Project for Expansion of Distribution Networks for Sustainable Water Supply in Siem Reap
    ឈ្មោះគម្រោងៈ គម្រោងពង្រីកបណ្តាញចែកចាយសម្រាប់ការផ្គត់ផ្គង់ទឹកប្រកបដោយនិរន្តរភាពក្នុងខេត្តសៀមរាប
2. PROJECT DATES:
PROJECT START :

3/1/2026

ESTIMATED COMPLETION :

03/01/2026

3. TOTAL PROJECT COST:
$

25000000

4. RESPONSIBLE MINISTRY:

Ministry of Industry, Science, Technology & Innovation

RESPONSIBLE UNIT:

Ministry of Industry, Science, Technology and Innovation

អង្គភាព​ទទួល​ខុស​ត្រូវ:

SRWSA

5. PROJECT STATUS

Planned


DETAILED PROJECT INFORMATION


6. TYPE OF PROJECT:

7. SOURCE OF PROJECT FUNDING:

8. THE POLICY AREA OF THE PENTAGON STRATEGY PHASE I THAT THIS PROJECT FALLS UNDER:
9. THE CONTRIBUTION OF THE PROJECT TO ACHIEVE THE ABOVE POLICY:
The Project will contribute to promote access to good quality,safe and affordable water supply ensuring good health and water security for all, and reduce poverty incidence
10. Support to Cambodia Industrial Development Policy
Does this Project support to the implementation of the Cambodia Industrial Development Policy?
Investment Promotion (Investment climate and Development of Special Economic Zones (SEZs) and Preparation of Industrial Zones) | ការជំរុញការទាក់ទាញវិនិយោគ (បរិយាកាសវិនិយោគ និងការអភិវឌ្ឍតំបន់សេដ្ឋកិច្ចពិសេសនិងការរៀបចំតំបន់ឧស្សាហកម្ម)
11. SECTOR:

12. PROJECT LOCATION: (Describe the location of the project and its components.)
All Provinces Banteay Meanchey Battambang Kampong Cham Kampong Chhnang
Kampong Speu Kampong Thom Kampot Kandal Kep
Koh Kong Kratie Mondul Kiri Otdar Meanchey Pailin
Phnom Penh Preah Sihanouk Preah Vihear Prey Veng Pursat
Ratanak Kiri Siem Reap Stung Treng Svay Rieng Takeo
Tbong Khmum
13. PROJECT OBJECTIVE: (Describe the major purpose of the project.)
Expand public piped water supply with better capacity and coverage to the citizens and tourist in Siem Reap city and surrounding areas in Siem Reap Province
14. PROJECT DESCRIPTION: (Provide a description of the project and all its components.)
-Package 1: Construction of open channel, water pump station, two lines of raw water conveyance pipes and treated water transmission main -Package 2: Supply and installation of water distribution pipes -Package 3: The construction of Water treatment plant of capacity 60,000m3/day and supply and installation of raw water &Treated Water pumps. Note: All the works under each contract has been completed. However SRWSA with agreement from JICA and MEF utilize remaining loan balance to implement additional works throught contract amendment to Contract Package1.
15. PROJECT JUSTIFICATION: (Give reasons why this particular project is considered worthwhile.)
Siem Reap is the best largest tourism center in Cambodia absorbing local and international tourist around 5 million per annum. However, the proportion of current water supply services of Siem Reap water supply Authority is around 43% of the total water demand. Thus, the project has been counted as the most prioritize project in order to realize the Royal Government of cambodia's vision over the urban water supply targeting 100% by 2025.
16. BENEFITS (Who will benefit, directly and indirectly, from the project?)
The Project will Connect around 154,000 People and tourists as well as other economic activity to Clean water supply in Siem Reap
17. FEASIBILITY STUDY
Is a "Feasibility Study " for the Project requied?
If YES, has it been carried out?
18. SOCIAL & ENVIRONMENTAL IMPACT: (Briefly describe the effects of the project, if any, on the people and the surrounding environment. Will the project assist in alleviating poverty?)
The main source of water is from the Great Tonle Sap Lake. The project contructions have no some impacts on submerged forests. However, IEIA report and EMP report were prepared and approved by Ministry of Environment. The affected forests were replanted by the project based on the required of the IEIA. the project also approved by the Tonle Sap Authority. This project is deemed to help reduce the expense for the people because the water supply will enhance health quality and reduce the expense for disease treatment due to the use of unclean water. In addition, it also reduces the dependency on underground water which could affect the balance of underground water and water and secure the foundation of ancient temples from erosion.
19. CLIMATE CHANGE
a. Is any activity or output of the project related to Climate Change?
If Yes, please indicate
b. How is the project relevant to Climate Change?
Please select a Climate Change related sector of the project and fill up the contribution of the climate change related expenditure compared to the total project cost.
Climate Change-Related Sector
Percentage
Climate Change Relevance
20. DISASTER RISK REDUCTION
Is any activity or output of the project related to Disaster Risk Reduction?
If Yes, please indicate
21. GENDER ANALYSIS: (How does the project affect the roles of the men and women in the project area? Will women be actively involved in the implementation of the project?)
The project will help woman in general who are charge of collecting water daily in the family. Likewise, kids will be in good health, reducing the mound of time and money for kid-care. Currently, the woman employee in the Siem Reap Water Authority are taking part to implement the project.
22. CAPACITY TO IMPLEMENT: (Does the Ministry have the skills and experience required to implement the project?)
Siem Reap Water Supply Authority has both expertise and experience to implementation the project Successfully with the guidance and supports from MEF and MISTI
23. STATUS OF PROJECT IMPLEMENTATION: (Provide a brief update on the progress of the project to date. Discuss any major problems causing delays in project implementation.)
Project Progress: -Package 1: The Construction was completed in December 2022. However, SRWSA with agreement from JICA and MEF Utilized remaining loan balance to implement additional works through contract amendment to this Contract Package 1. - Pakage 2: The Construction was completed in April 2023. The defect liability period was completd and final certificate was issued. -Package 3: The Construction was completed in June 2023. The project is under the defect liability period to be ended in july 2025.
24. PROJECT PRIORITY : (Please indicates the priority ranking of the project decided by the ministry/agency.)
1
25. DONOR INVOLVEMENT: (Provide any information on current or potential donor involvement in the project.)
Agent French Develpment (AFD)
26. REFERENCE: (Please upload the project documents, MOU, or agreements with funding agencies including MEF.)

Part B: Project Costs and Funding Sources

( In US$’000 )
INVESTMENT COST20242025
Budget
2026
Estimate
2027
Estimate
2028
Estimate
Total in 2026 - 2028Recurrent Cost Est.
BudgetActual
Operational Expenditure
Salaries
Materials + Admin
Other
Capital Expenditure
Construction
Consultancy (i.e. TA)
Equipment + Furniture
Training
Other
TOTAL COST
FUNDING SOURCES20242025
Budget
2026
Estimate
2027
Estimate
2028
Estimate
Total in 2026 - 2028Recurrent Cost Est.
BudgetActual
Project Revenue
Government Funding
Cash Input
Other Resources
Donor Funding
AfD
TOTAL COMMITTED FUNDING
FUNDING REQUIRED

​Project Progress

27.
Quarter Expenditure Percentage of Achievement Progress Description User
Quarter 1 0 0
Quarter 2 0 0
Quarter 3 0 0
Quarter 4 0 0
Total 0 0