PIP No:
1428
|
1. PROJECT NAME:
Rural Road Connectivity Improvement Project to the Coastal Provinces
|
ឈ្មោះគម្រោងៈ
គម្រោងកែលម្អផ្លូវជនបទតភ្ជាប់តំបន់ឆ្នេរសមុទ្រ
|
2. PROJECT DATES: |
PROJECT START :
|
ESTIMATED COMPLETION :
|
|
4. RESPONSIBLE MINISTRY:
Ministry of Rural Development
|
RESPONSIBLE UNIT:
|
អង្គភាពទទួលខុសត្រូវ:
|
5. PROJECT STATUS
|
|
DETAILED PROJECT INFORMATION
|
|
6. TYPE OF PROJECT:
|
7. SOURCE OF PROJECT FUNDING:
|
8. THE POLICY AREA OF THE PENTAGON STRATEGY PHASE I THAT THIS PROJECT FALLS UNDER: |
|
9. THE CONTRIBUTION OF THE PROJECT TO ACHIEVE THE ABOVE POLICY: |
Improving climate resilience of the rural transport system by connecting road network to the coastline zone. The proposed investment will contribute to sustainable
economic growth and poverty reduction efforts of the government through enhanced
connectivity to markets, jobs, improved all-season accessibility to education and
medical facilities and reduced transportation cost and time of population and
business in the project areas.
- Supporting human capital development and social services through improved all-season access to school, hospital/health centres, commune cenres and reduce road crush-related fatalities and disabilities. |
10. Support to Cambodia Industrial Development Policy |
Does this Project support to the implementation of the Cambodia Industrial Development Policy?
Four Key Concrete Measures (Energy, Transport, and Transport Policy and Management) | វិធានការគន្លឹះបួនជាក់ស្តែង (ថាមពល ការដឹកជញ្ជូន គោលនយោបាយដឹកជញ្ជូន និងការគ្រប់គ្រងការដឹកជញ្ជូន)
|
11. SECTOR:
|
|
|
|
|
12. PROJECT LOCATION: (Describe the location of the project and its components.) |
|
13. PROJECT OBJECTIVE: (Describe the major purpose of the project.) |
The project development objective is to improve climate resilient road access to economic and social facilities in coastline provinces; the achievement of PDO is proposed to be measured through the following PDO-level indicators:
• Rural road upgraded with climate resilience measures (kilometer)
• Bridges repaired/upgraded with climate resilience measures (number)
• People with reduced travel time to economic and social facilities (number)
•Economic facility: people with reduced travel time to market (number)
•Social facility: people with reduced travel time to schools, referral hospitals, health centers ,commune centers, posts, public conveniences
• Ensure all-year road access for rural population (accessibility)
• Total beneficiaries of project(number) |
14. PROJECT DESCRIPTION: (Provide a description of the project and all its components.) |
Roads are vitally important for transportation in Cambodia, both in urban and rural areas. Roads in Cambodia are jointly connected from urban to rural areas with a total length of about 63,134 km, including: (i) National Road (ii) Provincial Road and (iii) Rural Roads. About 7,261 km is National Road, Provincial Road is 9,031 km and 46,842 km is Rural Road. Ministry of Rural Development is responsible for rural roads while Ministry of Public Work and Transport is responsible for national and provincial roads. Among the total rural road network, in the coastal zone, it is about 2760km, entirely about 5% are paved and dominating 95% are unpaved and among the unpaved rural road, 72% are laterite or gravel roads. The majority of rural roads particularly unpaved are in poor condition and those roads are further deteriorated due to insufficient maintenance. the scope of work for coastal road improvement is length of 300km. |
15. PROJECT JUSTIFICATION: (Give reasons why this particular project is considered worthwhile.) |
This project is mainly developed toward the climate resilience rural road connectivity and ensure the all-season access for integrated rural development in the coastline zone . Build back better the rural roads that have been jeopardized by recent flood and targeted for most affected coastline provinces. Among many roads, only backbone roads are prioritized to improve toward sustainability and climate resilience and serving for economic corridor. Improved rural connectivity is to promote lifeline of national economic development with inclusive growth of social and economic. |
16. BENEFITS (Who will benefit, directly and indirectly, from the project?) |
The project is expected to benefit over 1 million people, predominantly a rural population across four provinces using the targeted road network. About 70% are women living in these four provinces.
|
17. FEASIBILITY STUDY |
Is a "Feasibility Study " for the Project requied?
|
If YES, has it been carried out?
|
18. SOCIAL & ENVIRONMENTAL IMPACT: (Briefly describe the effects of the project, if any, on the people and the surrounding environment. Will the project assist in alleviating poverty?) |
Applied network-wider approach for rural road improvement will be considered on all typical aspect, especially environmental and social impact with all stakeholders and communities through the public consultation. |
19. CLIMATE CHANGE |
a. Is any activity or output of the project related to Climate Change?
|
If Yes, please indicate
|
b. How is the project relevant to Climate Change?
|
Please select a Climate Change related sector of the project and fill up the contribution of the climate change related expenditure compared to the total project cost.
|
Climate Change-Related Sector
|
Percentage
|
Climate Change Relevance
|
15. Road improvement (including Climate Change proofing) | ១៥. ការកែលម្អផ្លូវថ្នល់ រួមមានការគិតគូរពីការប្រែប្រួលអាកាសធាតុ
|
50
|
Moderate
|
20. DISASTER RISK REDUCTION |
Is any activity or output of the project related to Disaster Risk Reduction?
|
If Yes, please indicate
|
21. GENDER ANALYSIS: (How does the project affect the roles of the men and women in the project area? Will women be actively involved in the implementation of the project?) |
The Gender Analysis will be applied and gender mainstreaming will be empowered for this project.
At least 20% of local women are employed by contractors/sub-contractor for roadwork with safety measurement. With this regards, GBV and VAC related series of training will be organized by the project team. The Gender Action Plan will be developed and implemented by project team and their GMAG, respectively. |
22. CAPACITY TO IMPLEMENT: (Does the Ministry have the skills and experience required to implement the project?) |
Yes of course. MRD/RRD has qualified technical staff to implement the project.
|
23. STATUS OF PROJECT IMPLEMENTATION: (Provide a brief update on the progress of the project to date. Discuss any major problems causing delays in project implementation.) |
Being Started the Feasibility Study |
24. PROJECT PRIORITY
:
(Please indicates the priority ranking of the project decided by the ministry/agency.)
|
2
|
25. DONOR INVOLVEMENT: (Provide any information on current or potential donor involvement in the project.) |
Mix of RGC, Grants or Loan |
26. REFERENCE: (Please upload the project documents, MOU, or agreements with funding agencies including MEF.) |
Part B: Project Costs and Funding Sources
( In US$’000 )
|
|