Project Information Sheet

Part A: Basic Project Information

( Must be completed in all cases )
PIP No: 1363
1. PROJECT NAME: Sihanoukville Port New Container Terminal Expansion Project-Phase 2 & Phase 3
    ឈ្មោះគម្រោងៈ គម្រោងពង្រីកចំណតផែកុងតឺន័រទឹកជ្រៅថ្មីកំពង់ផែក្រុងព្រះសីហនុ ជំហានទី២និងជំហានទី៣
2. PROJECT DATES:
PROJECT START :

6/1/2022

ESTIMATED COMPLETION :

06/30/2032

3. TOTAL PROJECT COST:
$

360000000

4. RESPONSIBLE MINISTRY:

Ministry of Public Works & Transport

RESPONSIBLE UNIT:

Sihanoukville Autonomous Port

អង្គភាព​ទទួល​ខុស​ត្រូវ:

កំពង់ផែស្វយ័តក្រុងព្រះសីហនុ

5. PROJECT STATUS

Planned


DETAILED PROJECT INFORMATION


6. TYPE OF PROJECT:

7. SOURCE OF PROJECT FUNDING:

8. THE POLICY AREA OF THE PENTAGON STRATEGY PHASE I THAT THIS PROJECT FALLS UNDER:
9. THE CONTRIBUTION OF THE PROJECT TO ACHIEVE THE ABOVE POLICY:
After having operated the New Container Terminal-Phase 2 (400 meters length and -16.5 meters depth) in 2028 and New Container Terminal-Phase 3 (430 meters length and -17.5 meters depth) in 2029, PAS will be able to attract the direct shipping services with Europe/North America to-from Cambodia without the transshipment in the other ports contributing to the economic benefit by reducing the transport time and cost and enhancement of the Cambodian economy.
10. Support to Cambodia Industrial Development Policy
Does this Project support to the implementation of the Cambodia Industrial Development Policy?
Four Key Concrete Measures (Energy, Transport, and Transport Policy and Management) | វិធានការគន្លឹះបួនជាក់ស្តែង (ថាមពល ការដឹកជញ្ជូន គោលនយោបាយដឹកជញ្ជូន និងការគ្រប់គ្រងការដឹកជញ្ជូន)
11. SECTOR:

12. PROJECT LOCATION: (Describe the location of the project and its components.)
All Provinces Banteay Meanchey Battambang Kampong Cham Kampong Chhnang
Kampong Speu Kampong Thom Kampot Kandal Kep
Koh Kong Kratie Mondul Kiri Otdar Meanchey Pailin
Phnom Penh Preah Sihanouk Preah Vihear Prey Veng Pursat
Ratanak Kiri Siem Reap Stung Treng Svay Rieng Takeo
Tbong Khmum
13. PROJECT OBJECTIVE: (Describe the major purpose of the project.)
The objective of the Project is to improve the container cargo handling capacity of Sihanoukville Port, the only international deep sea port in Cambodia, by expanding new container terminal and related infrastructure, thereby contributing to increase in shipping routes calling at Sihanoukville Port as well as to increase the trade facility in the Kingdom of Cambodia.
14. PROJECT DESCRIPTION: (Provide a description of the project and all its components.)
The Project consists of the four (04) major package as summarized below:. a- Package 1: Civil Work of New Container Terminal-Phase 2 (400m length and -16.5m depth) b- Package 2: Procurement of Cargo Handling Equipment for NCT2 & NCT 3 c- Package 3: Procurement of Working Vessels (02 Tugboats, 01 Pilot boat) d- Package 4: Civil Work of New Container Terminal-Phase 2 (430m length and -17.5m depth) The technical aspect of New Container Terminal-Phase 2 & Phase 3 are as follows:
15. PROJECT JUSTIFICATION: (Give reasons why this particular project is considered worthwhile.)
The construction of the New Container Terminal-Phase 2 (400 meters length and -16.5 meters depth) in 2028 and New Container Terminal-Phase 3 (430 meters length and -17.5 meters depth) in 2029 and equipping with the modern Container Handling Equipment and the procurement of Working Vessels in order to provide a vibrant, safe and efficient logistics system aimed at contributing to the enhancement of national competitiveness and people’s welfare in response to the national policies related to port capacity improvement are as follows: 1-Rectangular Strategy Phase IV (2018-2023), 2-National Strategic Development Plan (2019-2023), and 3-Cambodia Industrial Development Policy (2015-2025)
16. BENEFITS (Who will benefit, directly and indirectly, from the project?)
គម្រោងនេះ នឹងផ្តល់ប្រយោជន៍ដោយផ្ទាល់ដល់ប្រជាពលរដ្ឋខេត្តព្រះសីហនុប្រមាណ ២៥០,០០០នាក់ ហើយ ប្រជាពលរដ្ឋកម្ពុជាប្រមាណ ១៦លាននាក់ នឹងទទួលផលប្រយោជន៍មិនផ្ទាល់ពីគម្រោងនេះ ។
17. FEASIBILITY STUDY
Is a "Feasibility Study " for the Project requied?
If YES, has it been carried out?
18. SOCIAL & ENVIRONMENTAL IMPACT: (Briefly describe the effects of the project, if any, on the people and the surrounding environment. Will the project assist in alleviating poverty?)
The Environmental and Social Impact Assessment (ESIA) is now under the request for review and approval from the Ministry of Environment via the JICA Survey Team.
19. CLIMATE CHANGE
a. Is any activity or output of the project related to Climate Change?
b. How is the project relevant to Climate Change?
Please select a Climate Change related sector of the project and fill up the contribution of the climate change related expenditure compared to the total project cost.
Climate Change-Related Sector
Percentage
Climate Change Relevance
20. DISASTER RISK REDUCTION
Is any activity or output of the project related to Disaster Risk Reduction?
21. GENDER ANALYSIS: (How does the project affect the roles of the men and women in the project area? Will women be actively involved in the implementation of the project?)
This Project will not affect the roles of the men and women in the Project area. Whereas; the women is incentivized to serve as the staff of the Consulting firms and Contractor’s company during the implementation of the Project.
22. CAPACITY TO IMPLEMENT: (Does the Ministry have the skills and experience required to implement the project?)
Project Management Unit (PMU), which is the expertized unit and has sufficient experience for implementation of the Project, shall continue to manage and implement the said Project.
23. STATUS OF PROJECT IMPLEMENTATION: (Provide a brief update on the progress of the project to date. Discuss any major problems causing delays in project implementation.)
- ការសិក្សាសមិទ្ធិលទ្ធភាពគម្រោង ដោយក្រុមសិក្សា JICA Survey Team បានចាប់ផ្តើមនៅខែមករា ឆ្នាំ២០២១ហើយគ្រោងនឹងបញ្ចប់នៅខែមេសា ឆ្នាំ២០២២, - ក្រុមបេសកម្មស្វែងរកការពិតរបស់ បានចាប់ផ្តើមនៅដើមខែកុម្ភៈ ឆ្នាំ២០២២នេះ, និង - ពិធីផ្លាស់ប្តូរសារ (E/N) និងការចុះកិច្ចព្រមព្រៀងប្រាក់កម្ចី (L/A) គ្រោងនឹងធ្វើឡើងនៅខែមិថុនា ឆ្នាំ២០២២ រវាងរដ្ឋាភិបាលជប៉ុន និងរាជរដ្ឋាភិបាលកម្ពុជា ។
24. PROJECT PRIORITY : (Please indicates the priority ranking of the project decided by the ministry/agency.)
1
25. DONOR INVOLVEMENT: (Provide any information on current or potential donor involvement in the project.)
The Government of Japan through the Japan International Cooperation Agency is a potential donor for the Project.
26. REFERENCE: (Please upload the project documents, MOU, or agreements with funding agencies including MEF.)

Part B: Project Costs and Funding Sources

( In US$’000 )
INVESTMENT COST202320242025
Budget
2026
Estimate
2027
Estimate
Total in 2025 - 2027Recurrent Cost Est.
BudgetActualBudgetActual
Operational Expenditure
Salaries
Materials + Admin
Other
Capital Expenditure
Construction
Consultancy (i.e. TA)
Equipment + Furniture
Training
Other
TOTAL COST
FUNDING SOURCES202320242025
Budget
2026
Estimate
2027
Estimate
Total in 2025 - 2027Recurrent Cost Est.
BudgetActualBudgetActual
Project Revenue
Government Funding
Cash Input
Other Resources
Donor Funding
JICA
TOTAL COMMITTED FUNDING
FUNDING REQUIRED

​Project Progress

27.
Quarter Expenditure Percentage of Achievement Progress Description User
Quarter 1 0 0
Quarter 2 0 0
Quarter 3 0 0
Quarter 4 0 0
Total 0 0