Project Information Sheet

Part A: Basic Project Information

( Must be completed in all cases )
PIP No: 1154
1. PROJECT NAME: Cambodia-Korea Friendship Bridge Construction Project (Chrouy Changvar-Arey Ksat)
    ឈ្មោះគម្រោងៈ គម្រោងសាងសង់ស្ពានមិត្តភាពកម្ពុជា-កូរ៉េ (ជ្រោយចង្វារ-អរិយក្សត្រ)
2. PROJECT DATES:
PROJECT START :

1/1/2025

ESTIMATED COMPLETION :

12/31/2027

3. TOTAL PROJECT COST:
$

246000000

4. RESPONSIBLE MINISTRY:

Ministry of Public Works & Transport

RESPONSIBLE UNIT:

ក្រសួងសាធារណការ និងដឹកជញ្ជូន

អង្គភាព​ទទួល​ខុស​ត្រូវ:

អង្គភាពគ្រប់គ្រងគម្រោង ឯកឧត្តម សូរ វុិចទ័រ

5. PROJECT STATUS

On Going


DETAILED PROJECT INFORMATION


6. TYPE OF PROJECT:

7. SOURCE OF PROJECT FUNDING:

8. THE POLICY AREA OF THE PENTAGON STRATEGY PHASE I THAT THIS PROJECT FALLS UNDER:
9. THE CONTRIBUTION OF THE PROJECT TO ACHIEVE THE ABOVE POLICY:
National and ASEAN integration; poverty reduction of people along the constructed road; and economic development of Cambodia
10. Support to Cambodia Industrial Development Policy
Does this Project support to the implementation of the Cambodia Industrial Development Policy?
Four Key Concrete Measures (Energy, Transport, and Transport Policy and Management) | វិធានការគន្លឹះបួនជាក់ស្តែង (ថាមពល ការដឹកជញ្ជូន គោលនយោបាយដឹកជញ្ជូន និងការគ្រប់គ្រងការដឹកជញ្ជូន)
11. SECTOR:

12. PROJECT LOCATION: (Describe the location of the project and its components.)
All Provinces Banteay Meanchey Battambang Kampong Cham Kampong Chhnang
Kampong Speu Kampong Thom Kampot Kandal Kep
Koh Kong Kratie Mondul Kiri Otdar Meanchey Pailin
Phnom Penh Preah Sihanouk Preah Vihear Prey Veng Pursat
Ratanak Kiri Siem Reap Stung Treng Svay Rieng Takeo
Tbong Khmum
13. PROJECT OBJECTIVE: (Describe the major purpose of the project.)
1. Distribute urban traffic in connection with the Phnom Penh Ring Road Plan and to improve the Logistics flow of National Road (NR1, NR2, NR3, NR4, NR5, NR6, NR21) starting from Phnom Penh. 2. Accessibility and mobility of Kandal area on eastern side of the Mekong River, which remains develops land near the city center, will be dramatically improved, improving the living conditions of the residents of the Kandal area, increasing tourism and trade, and promoting urban expansion and revitalization of the local Economy.
14. PROJECT DESCRIPTION: (Provide a description of the project and all its components.)
Construction Road and two cable-stayed bridges, length 1,205m and 1,170m, connection from Daun Penh, Phnom Penh by crossing Chroy Changvar area to Akreiy Ksatr, Kandal Province.
15. PROJECT JUSTIFICATION: (Give reasons why this particular project is considered worthwhile.)
EIA of this project was prepared the analysis of related law and references, and the environmental reduction measures were established by reviewing the impact on all related physical, environmental, ecological, social, and cultural resources throughout construction and operation stage in Cambodia.
16. BENEFITS (Who will benefit, directly and indirectly, from the project?)
1. Shorten travel time from west of Phnom Penh to East of Kandal Province 2. Improve living standards for local residents 3. Better landmark of Phnom Penh 4. Contribute to the economic development of the underdeveloped Kandal region
17. FEASIBILITY STUDY
Is a "Feasibility Study " for the Project requied?
If YES, has it been carried out?
18. SOCIAL & ENVIRONMENTAL IMPACT: (Briefly describe the effects of the project, if any, on the people and the surrounding environment. Will the project assist in alleviating poverty?)
According to studies, Residents’ houses along the way will be relocated. Commercial land and agriculture land are also affected, but there will be an appropriate resettlement policy for those effected area. Moreover, the project will also assist in alleviating poverty.
19. CLIMATE CHANGE
a. Is any activity or output of the project related to Climate Change?
If Yes, please indicate
b. How is the project relevant to Climate Change?
Please select a Climate Change related sector of the project and fill up the contribution of the climate change related expenditure compared to the total project cost.
Climate Change-Related Sector
Percentage
Climate Change Relevance
20. DISASTER RISK REDUCTION
Is any activity or output of the project related to Disaster Risk Reduction?
If Yes, please indicate
21. GENDER ANALYSIS: (How does the project affect the roles of the men and women in the project area? Will women be actively involved in the implementation of the project?)
On the construction phase of this project, it will provide large quantity of employment opportunities for local people, causing income increasing for both men and women in the project area.
22. CAPACITY TO IMPLEMENT: (Does the Ministry have the skills and experience required to implement the project?)
Yes, the MPWT has the best capacity and rich experience on Road Infrastructure projects
23. STATUS OF PROJECT IMPLEMENTATION: (Provide a brief update on the progress of the project to date. Discuss any major problems causing delays in project implementation.)
Has finished Feasibility study
24. PROJECT PRIORITY : (Please indicates the priority ranking of the project decided by the ministry/agency.)
3
25. DONOR INVOLVEMENT: (Provide any information on current or potential donor involvement in the project.)
Korean Eximbank 88% and Royal Government of Cambodia 12%
26. REFERENCE: (Please upload the project documents, MOU, or agreements with funding agencies including MEF.)

Part B: Project Costs and Funding Sources

( In US$’000 )
INVESTMENT COST202320242025
Budget
2026
Estimate
2027
Estimate
Total in 2025 - 2027Recurrent Cost Est.
BudgetActualBudgetActual
Operational Expenditure
Salaries
Materials + Admin
Other
Capital Expenditure
Construction
Consultancy (i.e. TA)
Equipment + Furniture
Training
Other
TOTAL COST
FUNDING SOURCES202320242025
Budget
2026
Estimate
2027
Estimate
Total in 2025 - 2027Recurrent Cost Est.
BudgetActualBudgetActual
Project Revenue
Government Funding
Cash Input
Other Resources
Donor Funding
Republic of Korea
TOTAL COMMITTED FUNDING
FUNDING REQUIRED

​Project Progress

27.
Quarter Expenditure Percentage of Achievement Progress Description User
Quarter 1 0 0
Quarter 2 0 0
Quarter 3 0 0
Quarter 4 0 0
Total 0 0