1. PROJECT NAME:
Construction of National Road No.92 (Sam’ang- Kampong Sralau Muoy - Moummorokot) length 137.8km
|
ឈ្មោះគម្រោងៈ
គម្រោងសាងសង់ផ្លូវជាតិលេខ៩២ (សំអាង-កំពង់ស្រឡៅមួយ-មុំមរកត) ប្រវែង១៣៧.៨គ.ម
|
2. PROJECT DATES: |
PROJECT START :
|
ESTIMATED COMPLETION :
|
|
4. RESPONSIBLE MINISTRY:
Ministry of Public Works & Transport
|
RESPONSIBLE UNIT:
General Department of Public Works
|
អង្គភាពទទួលខុសត្រូវ:
|
5. PROJECT STATUS
|
|
DETAILED PROJECT INFORMATION
|
|
6. TYPE OF PROJECT:
|
7. SOURCE OF PROJECT FUNDING:
|
8. THE POLICY AREA OF THE PENTAGON STRATEGY PHASE I THAT THIS PROJECT FALLS UNDER: |
|
9. THE CONTRIBUTION OF THE PROJECT TO ACHIEVE THE ABOVE POLICY: |
Construct the physical infrastructure to the isolated area of Stung Treng Province and Preah Vihear Province, promoting the development of border economy of Cambodia. |
10. Support to Cambodia Industrial Development Policy |
Does this Project support to the implementation of the Cambodia Industrial Development Policy?
|
11. SECTOR:
|
|
|
|
|
12. PROJECT LOCATION: (Describe the location of the project and its components.) |
|
13. PROJECT OBJECTIVE: (Describe the major purpose of the project.) |
1. Improve the travel condition for residents along the route, promote the border area trading and tourism;
2. Promote the economic development along the route and reduce the poverty;
3. Strengthen the communication between border area and inland area of Cambodia, of great importance for improving the border traffic and promoting the development of border economy of Cambodia.
4. Accelerate the traffic transit among the northern border area in Preah Vihear Province and Stung Treng Province and make the traffic network in Cambodia more perfect by adding another high grade road along Cambodia-Laos border.
|
14. PROJECT DESCRIPTION: (Provide a description of the project and all its components.) |
The total length of NR92 is 137.8km. The design criteria for the road is based on highway Class Ⅲwith a design speed of 60km/h, the top width of the subgrade is 9m and arranged as: 1.0m soil shoulder +2×3.5m carriageway+1.0m soil shoulder = 9m. DBST is adopted for the surface course.
There are 39 bridges with total length of 1502m. There are 283 culverts with total length of 4811m. |
15. PROJECT JUSTIFICATION: (Give reasons why this particular project is considered worthwhile.) |
The main objective of this project is a branch line for NR9 and a border road along Cambodia-Laos border. The Project will intensify the road network from NR9 to the border and change the original linear traffic into network traffic thus dramatically improves the traffic capacity of border area and promotes the border area trading and tourism.
Accelerate the traffic collection and dispatching in northern Cambodia, thus providing favorable infrastructure for the development of tourism, saving the traveling time, raising the tourist taste and image for the northern provinces of Cambodia.
The proposed project runs along Cambodia-Laos border, the construction of the Project will contribute a lot to improving the traffic condition and enhancing the economic development of the border area. In addition, this project will strengthen the national defense infrastructure and adds another fast transit line for military transportation and logistics support.
Meanwhile, the construction of the project can promote the mutual communication and economic and trade cooperation among countries in the Great Mekong Region, enhance the peaceful development of those countries, and ensure regional safety and stability. |
16. BENEFITS (Who will benefit, directly and indirectly, from the project?) |
The people who live in this region. The national road network of Cambodia and the urban infrastructure of project region. |
17. FEASIBILITY STUDY |
Is a "Feasibility Study " for the Project requied?
|
If YES, has it been carried out?
|
18. SOCIAL & ENVIRONMENTAL IMPACT: (Briefly describe the effects of the project, if any, on the people and the surrounding environment. Will the project assist in alleviating poverty?) |
The Social & Environment Impact Report is being prepared. A certain quantity of house demolishing and land acquisition shall be conducted during construction. However, the completion of this project will exert positive influence on land utilization of this region, giving a strong support to the development of this region.
Corresponding measures against adverse environmental impact factors will be taken during the design period, construction period and operation period, so as to eliminate, retard or reduce the adverse impacts on environment and to achieve the purpose of environmental protection.
|
19. CLIMATE CHANGE |
a. Is any activity or output of the project related to Climate Change?
|
If Yes, please indicate
|
b. How is the project relevant to Climate Change?
|
Please select a Climate Change related sector of the project and fill up the contribution of the climate change related expenditure compared to the total project cost.
|
Climate Change-Related Sector
|
Percentage
|
Climate Change Relevance
|
|
|
|
20. DISASTER RISK REDUCTION |
Is any activity or output of the project related to Disaster Risk Reduction?
|
If Yes, please indicate
|
21. GENDER ANALYSIS: (How does the project affect the roles of the men and women in the project area? Will women be actively involved in the implementation of the project?) |
On the construction phase of this project, it will provide large quantity of employment opportunities for local people, causing income increasing for both men and women in the project area. |
22. CAPACITY TO IMPLEMENT: (Does the Ministry have the skills and experience required to implement the project?) |
Yes, the MPWT has the best capacity and rich experience on Road Infrastructure projects.
|
23. STATUS OF PROJECT IMPLEMENTATION: (Provide a brief update on the progress of the project to date. Discuss any major problems causing delays in project implementation.) |
Preliminary Design Scheme and Feasibility Study Report is being prepared.
Negotiation of Design and Construction Contract and Loan Agreement may cause delays in project implementation.
|
24. PROJECT PRIORITY
:
(Please indicates the priority ranking of the project decided by the ministry/agency.)
|
34
|
25. DONOR INVOLVEMENT: (Provide any information on current or potential donor involvement in the project.) |
China |
26. REFERENCE: (Please upload the project documents, MOU, or agreements with funding agencies including MEF.) |
Part B: Project Costs and Funding Sources
( In US$’000 )
|
|