Project Information Sheet

Part A: Basic Project Information

( Must be completed in all cases )
PIP No: 100
1. PROJECT NAME: Phnon Penh Ring Road No.3 (NR4 to NR1) With Main Line 47.608 Km and Branch Line 5.375 Km
    ឈ្មោះគម្រោងៈ គម្រោងសាងសង់ផ្លូវក្រវ៉ាត់ក្រុង ខ្សែទី៣ ពី​ផ្លូវជាតិលេខ៤ ទៅផ្លូវជាតិលេខ១ ប្រវែង ៤៧,៦០៨ គ.ម និងផ្លូវខ្នែង ៥,៣៧៥ គ.ម
2. PROJECT DATES:
PROJECT START :

1/1/2019

ESTIMATED COMPLETION :

09/06/2023

3. TOTAL PROJECT COST:
$

267670000

4. RESPONSIBLE MINISTRY:

Ministry of Public Works & Transport

RESPONSIBLE UNIT:

General Department of Public Works

អង្គភាព​ទទួល​ខុស​ត្រូវ:

អគ្គនាយកដ្ឋានសាធារណការ

5. PROJECT STATUS

Completed


DETAILED PROJECT INFORMATION


6. TYPE OF PROJECT:

7. SOURCE OF PROJECT FUNDING:

8. THE POLICY AREA OF THE PENTAGON STRATEGY PHASE I THAT THIS PROJECT FALLS UNDER:
9. THE CONTRIBUTION OF THE PROJECT TO ACHIEVE THE ABOVE POLICY:
Construct the physical infrastructure of Phnom Penh Capital Region, easing the south-north traffic pressure in the urban area and east-west traffic pressure crossing the Bassac River, supporting the socioeconomic development and urbanization process.
10. Support to Cambodia Industrial Development Policy
Does this Project support to the implementation of the Cambodia Industrial Development Policy?
11. SECTOR:

12. PROJECT LOCATION: (Describe the location of the project and its components.)
All Provinces Banteay Meanchey Battambang Kampong Cham Kampong Chhnang
Kampong Speu Kampong Thom Kampot Kandal Kep
Koh Kong Kratie Mondul Kiri Otdar Meanchey Pailin
Phnom Penh Preah Sihanouk Preah Vihear Prey Veng Pursat
Ratanak Kiri Siem Reap Stung Treng Svay Rieng Takeo
Tbong Khmum
13. PROJECT OBJECTIVE: (Describe the major purpose of the project.)
1. Improving National Road Network in Cambodia 2. Accelerating Urbanization, Enhancing Development of the City, Promoting City Status and Building Phnom Penh Metropolitan Area 3. Implementing Overall Plan of Phnom Penh city and Improving Ring Road Network 4. Achieving Fast Transit, Easing Traffic Pressure on Urban Area and Relieving Traffic Bottleneck on Existing Urban Roads 5. Enhancing Connection among Phnom Penh Airport, Railway Station and Phnom Penh Port New Container Terminal, Improving Collecting and Dispatching Capacity 6. Encouraging Comprehensive Development of Society and Economy
14. PROJECT DESCRIPTION: (Provide a description of the project and all its components.)
The total length of the Phnom Penh Ring Road No.3 (NR4~NR1) is 47.608Km, and branch line is 5.375Km. concrete surface course for branch line. Bridges & Culverts: For mainline, 11 bridges with total length of 1541m, 4 grade separations with total length of 1000m, totally 15 bridges with the total length of 2541m, and 113 culverts are proposed. For branch line, 2 bridges with total length of 130m, and 14 culverts are proposed.
15. PROJECT JUSTIFICATION: (Give reasons why this particular project is considered worthwhile.)
This project is the important part of the planned third ring road, connects with NR5, NR4, NR3, NR2, NR21&NR1 directly, and links to NR6 with other roads, forms the traffic main road of southwest Phnom Penh, which will reduce the traffic pressure of Phnom Penh City. The construction of this project will make a traffic diversion at City Area and connect with Port Area by branch line. It is the significance for improving logistics, reducing traffic pressure and alleviating traffic jams effectively.
16. BENEFITS (Who will benefit, directly and indirectly, from the project?)
The people who live in this region. The national road network of Cambodia and the urban infrastructure of Phnom Penh Capital.
17. FEASIBILITY STUDY
Is a "Feasibility Study " for the Project requied?
If YES, has it been carried out?
18. SOCIAL & ENVIRONMENTAL IMPACT: (Briefly describe the effects of the project, if any, on the people and the surrounding environment. Will the project assist in alleviating poverty?)
The Social & Environment Impact Report is being prepared. A certain quantity of house demolishing and land acquisition shall be conducted during construction. However, the completion of this project will exert positive influence on land utilization of this region, giving a strong support to the development of this region. Corresponding measures against adverse environmental impact factors will be taken during the design period, construction period and operation period, so as to eliminate, retard or reduce the adverse impacts on environment and to achieve the purpose of environmental protection.
19. CLIMATE CHANGE
a. Is any activity or output of the project related to Climate Change?
b. How is the project relevant to Climate Change?
Please select a Climate Change related sector of the project and fill up the contribution of the climate change related expenditure compared to the total project cost.
Climate Change-Related Sector
Percentage
Climate Change Relevance
20. DISASTER RISK REDUCTION
Is any activity or output of the project related to Disaster Risk Reduction?
21. GENDER ANALYSIS: (How does the project affect the roles of the men and women in the project area? Will women be actively involved in the implementation of the project?)
On the construction phase of this project, it will provide large quantity of employment opportunities for local people, causing income increasing for both men and women in the project area.
22. CAPACITY TO IMPLEMENT: (Does the Ministry have the skills and experience required to implement the project?)
Yes, the MPWT has the best capacity and rich experience on Road Infrastructure projects.
23. STATUS OF PROJECT IMPLEMENTATION: (Provide a brief update on the progress of the project to date. Discuss any major problems causing delays in project implementation.)
Has completed Preliminary Design Scheme in April, 2015. Has completed Preliminary Design and Feasibility Study Report in February, 2016. Negotiation of Design and Construction Contract and Loan Agreement may cause delays in project implementation.
24. PROJECT PRIORITY : (Please indicates the priority ranking of the project decided by the ministry/agency.)
33
25. DONOR INVOLVEMENT: (Provide any information on current or potential donor involvement in the project.)
China
26. REFERENCE: (Please upload the project documents, MOU, or agreements with funding agencies including MEF.)

Part B: Project Costs and Funding Sources

( In US$’000 )
INVESTMENT COST2022202320242025
Budget
2026
Estimate
Total in 2024 - 2026Recurrent Cost Est.
BudgetActualBudgetActualBudgetActual
Operational Expenditure
Salaries
Materials + Admin
Other
Capital Expenditure
Construction
Consultancy (i.e. TA)
Equipment + Furniture
Training
Other
TOTAL COST
FUNDING SOURCES2022202320242025
Budget
2026
Estimate
Total in 2024 - 2026Recurrent Cost Est.
BudgetActualBudgetActualBudgetActual
Project Revenue
Government Funding
Cash Input
Other Resources
Donor Funding
China
TOTAL COMMITTED FUNDING
FUNDING REQUIRED

​Project Progress

27.
Quarter Expenditure Percentage of Achievement Progress Description User
Quarter 1 0 0
Quarter 2 0 0
Quarter 3 0 0
Quarter 4 0 0
Total 0 0